maritime

Pipe rigging inspection

DWA Industrial team got tasked to boat 10 miles out to sea to meet a tug that was transporting 500mx3m pipes across the world. These pipes are so big that they have to be towed around the world by sea.

The objective was to inspect the rigging between all 4 pipes before the divers replaced them and again after.

DWA has done this multiple times as there has been multiple shipments of these pipes and no other way to inspect them.

DJI_0011.JPG